Precision DC power conversion for your electrolyser.
Green hydrogen projects involve a layered supply chain. Yonder's role is precise: we deliver the DC power conversion architecture that sits between the grid and the electrolyser. Understanding exactly where we contribute (and where we don't) matters to how you plan your project.
Secures offtake, sets the commercial timeline.
Defines the strict DC power requirements and the electrochemical sensitivity envelope.
Yonder supplies the DC power conversion equipment to the electrolyser manufacturer or EPC contractor, engineered to the electrolyser's exact requirements.
Every system is engineered to your electrolyser.
Send your electrolyser manufacturer, chemistry, MW project scale, and grid parameters. Our engineers return a preliminary converter configuration with a quick turnaround.
Unlike off-the-shelf vendors, Yonder enters at the plant specification stage. Integration issues are engineered out before a single component is manufactured.
On-site integration directly with your electrolyser and grid tie-ins. We don't hand over a document. We stay until the plant runs.
Every system ships with an 18-month warranty, field service, and spare parts support. Extended maintenance contracts are available for ongoing coverage.
